Mount Lucas Wind Farm

PROJECT NAME: Mount Lucas Wind Farm
CLIENT: Bord na Mona

Client Overview

Bord na Mona are Irelnd's leading environmentally responsible integrated utility service provider encompassing electricity, heating solutions, resource recovery, water, horticulture and related services.

Project Details

The project, awarded to consortium of KTL, Gaeltec Utilities and PJ Careys, consisted on the Civil and Electrical Balance of Plant of 27 turbine 81MW wind farm project in Mount Lucas in Co. Offaly.

The scope of works included:

  • Design and construct>18km of roads
  • Construction of 28No turbine foundations(>600m3 per foundation)
  • Design and construct complete drainage system for above developments
  • Design and Construct 110kV substation
  • Includes all civil and buildings works (fencing, ducting, building, excavations etc)
  • All Contestable works associated with the station
  • Control and protection design/install/commission
  • Building services system
  • LV Power and control systems
  • Earthing system inc external counterpoise system
  • DC system
  • 2 Line Bays and 1 Trafo bay in a looped substation
  • Design and construct 20kV substation
  • Includes all civil and building works
  • Supply of 110kV/20kV Grid Trafo
  • Trafo Bay
  • 20kV Switchgear
  • DC systems
  • Building and site services
  • Design and construct 1.2km 110kV OHL
  • Design, supply and installation of 100m Meteorological Mast
  • Design, supply and installation of MV collector and FO/Scada Network
  • 102km MV cable (95mm sq to 630mm sq)
  • 30km FO Network
  • 30km Counterpoise Eearthing system
  • Upgrade of R400 and R401 National Roads
Home Projects Electricity Network Services Mount Lucas Wind Farm

Head Office

Killarney Telecommunications Limited.
Unit P, M7 Business Park,
Newhall, Naas,
Co. Kildare,
Company Number: 280010

Office - UK

Unit 5, Denbigh Hall Industrial Estate, 
Milton Keynes,



ISO Certified in Ireland