Safety, Health,
Environment, Quality (SHEQ)

RIGHT FIRST TIME; EVERYBODY, EVERY TIME

Health and Safety, Quality and Environmental Awareness is a priority throughout KTL, and we constantly invest time and knowledge into maintaining and improving this.

(PNG)4.2 SHEQ-4.png

Health and Safety

Site safety is at the forefront of activities on all KTL projects, from planning stages through to implementation and final handover. We conduct regular communication sessions and training to achieve our zero-injury policy.

Environment

(PNG)4.2 SHEQ-5 copy.png

We are committed to our environmental policy and constantly look to improve our performance and prevent pollution. During all our work, we strive to minimise effects on local inhabitants, the surrounding and global environment, and to prevent material damage.

(PNG)4.2 SHEQ-6 copy.png

Quality

Right first time is what KTL sets out to achieve. Using cutting edge technology and a team of highly trained personnel, we ensure that we deliver the best possible service for our customers.

KTL SHEQ Policy Statement

Our management system is certified to:

KTL Life Saving Rules

01.png

Safety Takes
Official Priority 

Anyone has the right to stop work if they feel it's unsafe to continue. 

02_Working at Height.png

Working at Height

Always protect yourself against falls from height. Wear a harness and fall arrest system or lanyards on a fixed access ladder or climbable structure

regardless of height.

04_Driving.png

Driving 

Do not exceed speed limits, never use handheld devices while driving and always wear a seatbelt. 

05_Alcohol and Drugs.png

Alcohol and Drugs

Never work or drive under the influence of drugs or alcohol.

06_Exclusion Zones.png

Exclusion Zones

Remain clear of exclusion zones and only enter if authorised to do so.

07_Equipment.png

Equipment 

Ensure that you have the correct plant, tools equipment and PPE. That you are competent to use them and they are in a safe and serviceable condition prior to use. 

03_Electrical.png

Electrical 

Do not work on electrical systems unless you are competent to do so. Always verify energy isolation before commencing work. 

09_Design.png

Design 

Eliminate foreseeable health and safety risks to anyone affected by the project (if possible). Take steps to reduce or control any risks that cannot be eliminated.

10_Mental Health & Wellbeing.png

Mental Health
& Wellbeing 

Seek support if you are experiencing any symptoms of ill health or you're concerned for someone's wellbeing. 

08_Safety Documentation.png

Safety Documentation 

Ensure that you have a suitable and sufficient safe system of work in place and any permits or permissions have been approved before commencing work. 

ISO-45001.png
ISO-27001.png
ISO-14001.png
ISO-9001.png

Additional accreditations